Blog
Showing Entries with tag "modularization"
Close
Entry Tags (76 found)
AI Artificial Intelligence biogas building decarbonization building decarbonization building electrification building electrification CDU Central Plant Controls central utility plant chemours discovery hub community relations construction in Focus coolant distribution unit cooling plant critichill decabonization decarbonization design-assist design-build district cooling plant efficiency electric vehicle batteries electrification electrification energy energy Engie expansion Factory Built Factory Testing food pantry geo-exchange geothermal energy geothermal energy geothermal plant geothermal plant Guaranteed Performance Interactive Optimization minimal water usage modular modular biogas boiler plant modular boiler plant modular central plant modular chiller plant modular construction modular design packages modular process Modular Pump System modular utility solution modular utility system modularization multi-phase building offsite construction onshoring PCW Performance Testing Prefab process cooling water pump package pumping system Reach Out Lakota renewable energy renewable energy reshoring ROLCanCreations semiconductor chips steam boiler Systecon Systecon Inc System Controls variprime Virtual Tour Welcome wire-to-water Wire-to-Water EfficiencyProper planning from inception is important for manufactured products like modular utility systems. With most projects driven up front in the early design or pre-construction phases by owners and consulting engineers, early engagement in the design-assist process is key in developing a modularization plan and scope.